Lynbrook Station Viaduct

Owner
MTA Long Island Railroad
Contract #: 6344

Scope of Work
The work performed under this Contract consisted on the repairs of the Lynbrook Station Viaduct . The contract includes the concrete repairs, saw cut concrete edges, remove loose concrete and rust from steel reinforcement, install form and patch, finish concrete surfaces, repair concrete cracks, apply epoxy bounding compound, protect or temporary relocate all existing utilities, traffic lights, signs, remove and reinstall any bird proofing, provide MPT for the performance of the work at street level, obtain necessary NYSDOT and/or local municipality permits, coordinate all work and street closures with LIRR.

Dates
Award Letter was issued on June 5, 2019
Construction end September 4, 2020
  • 17
  • 21
  • 4
  • 9
  • IMG_5829
  • IMG_5888
  • IMG_5997
  • IMG_8414
  • download (1)
  • download (2)
  • download (3)
  • download (4)
  • download (5)
  • lynbrook27