Bridge Painting at Guy Brewer Blvd

Owner
MTA LIRR
Contract #: 6342

Scope of Work
The work performed under this
Contract #: consisted of the surface preparation using sand blasting on lead paint and Painting. The project includes MPT on active streets and Installation of suspended platforms.

Dates
Award Letter was issued on January 31, 2020
Construction end Date September 30,2020
  • architecture-bridge-cars-city-111090